豪威(Omnivision)笔试题
Omnivision examiner use only
2005 china career fair exam
1 logic design
e is a fifo design which the clock of data input is running at100mhz,while the clock of data output is running at inputdata is a fix pattern .800 input clocks carry in 800 datacontinuously,and the other 200 clocks carry in no big the fifoshould be in order to avoid data over/under_run?please select theminimum depth below to meet the requirement.
A.160 b.200 c.800 d .1000
osedly there is acombinational circuit between two registersdriven by a will you do if the delay of the combinationalcircuit is greater than the clock signal?
reduce clock frequency increase clock frequency
make it pipelining d to make it multi_cycle
h of the follow circuits can generate gitch free gated_clk?
ys@(posedge clk) gated <=en;assign gated_clk=gated&~clk;
ys@(negedge clk) gated <=en;assign gated_clk=gated&~clk;
ys@(posedge clk) gated <=en;assign gated_clk=gated|~clk;
ys@(negedge clk) gated <=en;assign gated_clk=gated|~clk;
’re working on a specification of a system with some parameter has min,typ and max h columnwould you put setup and hold time?
p time in max,hold time in min
p time in min,hold time in max
in max
in min
e are 3 ants at 3corners of a triangle. They randomly startmoving towards another is the probability that won’tcollide?
a.0
b.1/8
c/1/4
d.1/3
you look at a clock and the time is 3: is angle between the hour and the minute hand?
a.0
b.360/48
3.360/12
d.360/4
many times per day a clock’s hands overlap?
a.11
b.22
c.24
d.26
8.d flip-flop :t_setup=3 ns; t_hold =1 ns; t_ck2q= is the max clock frequency the circuit can handle?
A.200mhz
b.250mhz
c.500mhz
d.1ghz
ical design
re tape-out,which routine check should be performed for your layout database in 0.18 um process?
&antenna
lation
to fix antenna effect?
the wire wider and shorter
ge lower metal to upper metal
ect with diode of metal and diffusion
ge upper metal to lower metal
e.b&c
se expain lvs
c versus schematic
ut versus schematic
ut via synthesis
c via synthesis
to control clock skew?
balanced clock tree
ease the fanout
clock buffer evenly
ease clock latency
to avoid hold_time violation?
r the clock speed
clock arrive later
clock arrive earlier
data arrive later
data arrive earlier
-
2016年南京师范大学硕士研究生复试录取办法
南京师范大学已公布了2016年硕士研究生复试的录取办法,请上线考生及时查看信息,了解考研复试的相关注意事项,下面是小编搜集整理的详细资料,供大家阅读查看。一、基本原则1.科学选拔,保证质量。树立科学的人才选拔理念,坚持能力与知识考核并重,着力加强对考生创新能...
-
2016年云南大学报考点现场确认须知
2017年的院校考研现场确认公布还没有公布了,下面是小编搜集整理的2016年云南大学报考点现场确认须知,供考生们阅读参考。各位报考考点为云南大学(5306)的考生:为做好我考点2016年全国硕士研究生招生考试报名工作,确保报名现场确认工组织实施规范有序、平稳顺利,根据...
-
四川理工学院2016考研现场确认要求及注意事项
一、网报时间:1、应届本科毕业生网上预报名时间为2015年9月24日至27日9:00-22:00。2、网上报名时间为2015年10月10日至31日每天9:00-22:00。二、现场确认时间、地点:1、时间:2015年11月7日至12日(上午9:00-12:00、下午14:00-17:00)11月7-8日(周末):宜宾学院、内江...
-
减负考研成本,清扫考研障碍
表面风光,内心彷徨;容颜未老,心已沧桑。大学生本应朝气蓬勃,最近这条流行于网上的段子,被越来越多的大学生挂在嘴边。就业、考研和人际关系成为大学生最大困扰。同样在考研的路途中也会遭遇到如成本、人际关系等障碍,在接下来的暑期阶段,如何更加顺利地走过?考研辅导...