豪威(Omnivision)笔试题目
考研2.87W
Omnivision examiner use only
2005 china career fair exam
1 logic design
e is a fifo design which the clock of data input is running at100mhz,while the clock of data output is running at inputdata is a fix pattern .800 input clocks carry in 800 datacontinuously,and the other 200 clocks carry in no big the fifoshould be in order to avoid data over/under_run?please select theminimum depth below to meet the requirement.
A.160 b.200 c.800 d .1000
osedly there is acombinational circuit between two registersdriven by a will you do if the delay of the combinationalcircuit is greater than the clock signal?
reduce clock frequency increase clock frequency
make it pipelining d to make it multi_cycle
h of the follow circuits can generate gitch free gated_clk?
ys@(posedge clk) gated <=en;assign gated_clk=gated&~clk;
ys@(negedge clk) gated <=en;assign gated_clk=gated&~clk;
ys@(posedge clk) gated <=en;assign gated_clk=gated|~clk;
ys@(negedge clk) gated <=en;assign gated_clk=gated|~clk;
’re working on a specification of a system with some parameter has min,typ and max h columnwould you put setup and hold time?
p time in max,hold time in min
p time in min,hold time in max
in max
in min
e are 3 ants at 3corners of a triangle. They randomly startmoving towards another is the probability that won’tcollide?
a.0
b.1/8
c/1/4
d.1/3
you look at a clock and the time is 3: is angle between the hour and the minute hand?
a.0
b.360/48
3.360/12
d.360/4
many times per day a clock’s hands overlap?
a.11
b.22
c.24
d.26
8.d flip-flop :t_setup=3 ns; t_hold =1 ns; t_ck2q= is the max clock frequency the circuit can handle?
A.200mhz
b.250mhz
c.500mhz
d.1ghz
ical design
re tape-out,which routine check should be performed for your layout database in 0.18 um process?
&antenna
lation
to fix antenna effect?
the wire wider and shorter
ge lower metal to upper metal
ect with diode of metal and diffusion
ge upper metal to lower metal
e.b&c
se expain lvs
c versus schematic
ut versus schematic
ut via synthesis
c via synthesis
to control clock skew?
balanced clock tree
ease the fanout
clock buffer evenly
ease clock latency
to avoid hold_time violation?
r the clock speed
clock arrive later
clock arrive earlier
data arrive later
data arrive earlier
kinds of factors reflect good floor plan?
routing
timing met
gh power supply
d.a&b
e.a&b&c
cause cell delay?
t-pin transition time
ut-pin capacitance.
ut-pin resistance
d.a&b
e.b&c
need i/o pads for each chip?
protection
age level shift
h-up prevention
d.a&c
e.a&b&c
h one is worse-case in 0.18um process?
1.1.8v,25c
2.1.98v,125c
3.1.62v,-40c
4.1.62v,125c
5.1.98v,-40c
power plan is not good,what’ll happen to the chip?
a.hot-spot
age drop
ng not met
ing is tough
of above
itecture design
are two images,the first image has a person in front of ablackboard in a classroom and the second image has a person in front ofa lush two images are compressed using the jpeg algorithm.
first image will have larger file size.
second image will have a larger file size.
would you round a 10b number,x,at the 3rd(上角)bit?
a.(x>>2)<<2.
b.(x>>3)<<3.
c.((x+4)>>2)<<2
d.((x+4)>>2)<<3
e.((x+8)>>2)<<3
f.((x+8)>>3)<<3
happens if the number in 2 is negative?
A ignore
it absolute ,do the operation in 2,and add sign back
of the above
would you multiply a 4 in hardware?
4 adders each is offset from the provious adder by 1bit.
a booth multip;ier with 4b coefficient.
wires.
a barrel shifter.
is a fifo?what is a filo?which one is a queue? Which one is a stack?
is a queue and filo is a stack.
is the name of a dog. Filo is the name of a cat.
is a stack and filo is a queue.
would you design a barrel shifter?
multiple stages of 2乘2 multiplexers
a crossbar switch that can switch any inputs to any outputs
a clos network
muxes to switch between all combinations of hardwired shifts.
还有chip verification、algorithm design、hardware design、analog design。
2005 china career fair exam
1 logic design
e is a fifo design which the clock of data input is running at100mhz,while the clock of data output is running at inputdata is a fix pattern .800 input clocks carry in 800 datacontinuously,and the other 200 clocks carry in no big the fifoshould be in order to avoid data over/under_run?please select theminimum depth below to meet the requirement.
A.160 b.200 c.800 d .1000
osedly there is acombinational circuit between two registersdriven by a will you do if the delay of the combinationalcircuit is greater than the clock signal?
reduce clock frequency increase clock frequency
make it pipelining d to make it multi_cycle
h of the follow circuits can generate gitch free gated_clk?
ys@(posedge clk) gated <=en;assign gated_clk=gated&~clk;
ys@(negedge clk) gated <=en;assign gated_clk=gated&~clk;
ys@(posedge clk) gated <=en;assign gated_clk=gated|~clk;
ys@(negedge clk) gated <=en;assign gated_clk=gated|~clk;
’re working on a specification of a system with some parameter has min,typ and max h columnwould you put setup and hold time?
p time in max,hold time in min
p time in min,hold time in max
in max
in min
e are 3 ants at 3corners of a triangle. They randomly startmoving towards another is the probability that won’tcollide?
a.0
b.1/8
c/1/4
d.1/3
you look at a clock and the time is 3: is angle between the hour and the minute hand?
a.0
b.360/48
3.360/12
d.360/4
many times per day a clock’s hands overlap?
a.11
b.22
c.24
d.26
8.d flip-flop :t_setup=3 ns; t_hold =1 ns; t_ck2q= is the max clock frequency the circuit can handle?
A.200mhz
b.250mhz
c.500mhz
d.1ghz
ical design
re tape-out,which routine check should be performed for your layout database in 0.18 um process?
&antenna
lation
to fix antenna effect?
the wire wider and shorter
ge lower metal to upper metal
ect with diode of metal and diffusion
ge upper metal to lower metal
e.b&c
se expain lvs
c versus schematic
ut versus schematic
ut via synthesis
c via synthesis
to control clock skew?
balanced clock tree
ease the fanout
clock buffer evenly
ease clock latency
to avoid hold_time violation?
r the clock speed
clock arrive later
clock arrive earlier
data arrive later
data arrive earlier
kinds of factors reflect good floor plan?
routing
timing met
gh power supply
d.a&b
e.a&b&c
cause cell delay?
t-pin transition time
ut-pin capacitance.
ut-pin resistance
d.a&b
e.b&c
need i/o pads for each chip?
protection
age level shift
h-up prevention
d.a&c
e.a&b&c
h one is worse-case in 0.18um process?
1.1.8v,25c
2.1.98v,125c
3.1.62v,-40c
4.1.62v,125c
5.1.98v,-40c
power plan is not good,what’ll happen to the chip?
a.hot-spot
age drop
ng not met
ing is tough
of above
itecture design
are two images,the first image has a person in front of ablackboard in a classroom and the second image has a person in front ofa lush two images are compressed using the jpeg algorithm.
first image will have larger file size.
second image will have a larger file size.
would you round a 10b number,x,at the 3rd(上角)bit?
a.(x>>2)<<2.
b.(x>>3)<<3.
c.((x+4)>>2)<<2
d.((x+4)>>2)<<3
e.((x+8)>>2)<<3
f.((x+8)>>3)<<3
happens if the number in 2 is negative?
A ignore
it absolute ,do the operation in 2,and add sign back
of the above
would you multiply a 4 in hardware?
4 adders each is offset from the provious adder by 1bit.
a booth multip;ier with 4b coefficient.
wires.
a barrel shifter.
is a fifo?what is a filo?which one is a queue? Which one is a stack?
is a queue and filo is a stack.
is the name of a dog. Filo is the name of a cat.
is a stack and filo is a queue.
would you design a barrel shifter?
multiple stages of 2乘2 multiplexers
a crossbar switch that can switch any inputs to any outputs
a clos network
muxes to switch between all combinations of hardwired shifts.
还有chip verification、algorithm design、hardware design、analog design。
-
考研择校择专业常见问题解答
下面是小编搜集整理的一些考研择校择专业常见问题解答,有需要的朋友可以看看,希望对你有帮助。一、院校优先还是专业优先?(1)原则:院校为主兼顾专业:实力至上,如果你有充分的实力并做好多次考研的困难准备,就选择自己最中意的院校或专业,不需要考虑其他因素,相信自己,有...
-
北京大学心理学2017考研参考书目
随着考研接近,各地考生们都在积极复习备考。各院校也开始公布了各自的考研参考资料。下面是小编为大家整理收集的北京大学心理学2017考研参考书目,仅供大家参考。北京大学心理学系已形成师资力量雄厚、学科设置齐全、专业人才层出不穷的教学、科研体系。北京大学...
-
2017年江西中医药大学社会医学与卫生事业管理考研专业目录及考试
随着2017考研的到来,相关的考研招生信息也开始公布了。下面是小编为大家整理收集的关于2017年江西中医药大学社会医学与卫生事业管理考研专业目录及考试科目的相关内容,欢迎大家的阅读。学校简介:江西中医药大学(JiangxiUniversityofTraditionalChineseMedicine),...
-
南京财经大学2015年考研复试通知发布
近日,南京财经大学研究生院发布《南京财经大学2015年报考攻读硕士学位研究生复试通知》,从中获悉南京财经大学2015年考研复试相关信息。2015年硕士研究生复试定于3月30日-4月1日进行,请务必于2015年3月30日15:00前到我校办理报到手续并参加复试,报到时间及地点见复...